Shaw Turn Key Project Red River Ex

Project Duration

April 13

Project Timeframe

May 02

Project Overview

This project was our first turn key project for 2017. From engineering to actual construction every thing was done at superb. Project was finished well before deadline thanks to our construction crews and state of the art equipment.

Project Services

  • Shaw Fiber Installation
  • Horizontal Directional Drilling
  • Hydrovac

Project Execution

Conceptual

Design Development